• Loss ledger, Weld Line 1 38 min Availability 22 min Performance 14 min Quality

Asset OEE

See which factor pulled your OEE down

A single OEE number hides why it moved, so each factor gets its own calculation. Availability comes from run state and downtime. Performance comes from actual cycle time against target. Quality comes from good units against rejects and rework.

  • Availability, from run state and recorded downtime
  • Performance, from actual cycle time against target
  • Quality, from good units against rejects and rework
  • OEE roll-up Northbay Industrial Brantford Plant 2 Machining Cell A

OEE roll-up

Roll OEE up from one machine to the whole plant

One calculation answers for a single machine and for the whole plant. Pick a site, area, line or asset and any date range. A line total always adds up to its assets.

  • Site, area, line, and asset, from one calculation
  • A line total that reconciles to its own assets
  • Every roll-up runs over the range you choose
  • Live line status: Weld Line 1 BRF2-LN-03 68.3 Slow
  • Performance factor moved

Live line status

Watch which assets are running, faulted or idle

Every reporting asset shows running, faulted or idle as it happens. Filter to what’s down and see which factor it’s costing you, before anyone writes the shift report.

  • Current state on every asset in the list
  • Filter the list to faulted or idle
  • State sits beside the factor it moved
  • OEE, Weld Line 182.6

Range comparison

Compare this week against last

Pick two date ranges and every factor recalculates for each. Put this week against last, or one run against another, side by side.

  • Any date range, at asset, line, area, or site
  • This week against last, or one run against another
  • Charts with tooltips that name what each figure is
  • OEE trend, 90 days82

Daily records

Pull up a year of OEE trend in one load

Each day the engine writes a record for every asset, so a year of trend loads without re-reading every raw reading. Need history from before you started? Backfill a past range.

  • A daily snapshot per asset, stored as a record
  • Backfill the records across a past range
  • Trends read those snapshots instead of the raw series
  • Site OEE, this shift 84.2
  • Also on command center

Command center

Bring the same number into every meeting

The executive summary and the command center read the same calculation the floor reads. Leadership gets one site figure, planning gets line performance, and nobody rebuilds a spreadsheet before the review.

  • One summary figure across the site on the executive view
  • Line performance on the production planning command center
  • No OEE spreadsheet rebuilt before the review

FAQ

Find out what your OEE number is made of.

30 minutes on your counts and states. We'll show you how the OEE Engine rolls them up.